The Lingyuan Municipal Solid Waste Incineration Power Generation Project covers an area of 43333 square meters, with a total investment of 520 million yuan. It is invested and constructed by Lingyuan Hanwei Environmental Protection Energy Co., Ltd. The project will be constructed in two phases. The first phase will process 800 tons of waste per day, 292000 tons of domestic waste per year, operate for 8000 hours per year, generate 91.74 million kilowatt hours of electricity per year, and generate 75.23 million kilowatt hours of electricity on the grid.
The power distribution equipment of this project adopts SF18-2000/66 air-cooled transformers produced by CHINA ZBB Group, and uses mechanical grate furnace technology to generate electricity on the grid by utilizing the heat generated after garbage incineration.
After the completion of the project, it will solve the problem of domestic waste treatment in the central urban area of Lingyuan and surrounding cities and counties, fully utilize the waste, turn it into treasure, achieve the reduction, stability, harmlessness, and resource utilization of domestic waste treatment, achieve comprehensive resource recycling, and greatly improve the living environment of urban and rural residents.