CHINA ZBB Group: Nanning North Station Road Reconstruction under Bridge Space Project
2023-09-15

The space project under the bridge of Nanning North Station Road Reconstruction Bridge is constructed by Guangxi Company of Yungui Railway and the Guiyang High speed Railway Project Department of China Railway Construction. The distribution equipment is an amorphous dry-type transformer provided by CHINA ZBB Group: SCBH19-315/10-0.4 (4 units), SCBH19-800/10-0.4 (2 units).


9aa7af308cce567cdc1f8f7ba00cc38f.png

ee128def5c45b49c5a5540c5b4deafbb.png


The project is located under the railway station building and yard bridge of Nanning North Station, with a total scale of 49630.78 square meters. This project combines the planning of the Nanning North Station hub and fully utilizes the space under the railway bridge to set up a social and ride hailing parking lot of 11094.2 square meters, a taxi storage yard of 4922.98 square meters, a bus storage yard of 10534.05 square meters, a bus storage yard of 4047.11 square meters, and a non motorized vehicle parking lot of 2035.59 square meters. At the same time, it will also build green engineering, transfer channels, and auxiliary facilities for the parking lot equipment to improve the convenience of high-speed rail and other urban transportation vehicles.


140cdaaff9a6b7b7ef124b09b9404198.png


After the completion of the project, Nanning North Station will form a comprehensive transportation hub complex that integrates high-speed rail, subway, long-distance passenger transportation, public transportation, and taxi services, with zero transfer and seamless connection. This will play a positive role in improving the travel and transfer experience of passengers and strengthening the transportation connection between Wuming District, ASEAN Economic Development Zone, and the main urban area of Nanning.