The project is located on the NNW-C4B-02 plot in the main urban area of Lingang New Area. It is planned to build a 30 class high school, which mainly includes the construction of a five story comprehensive teaching building, a five story dormitory building, an underground parking lot, auxiliary buildings, and outdoor activity areas.
The total construction area of the new project is about 58308 square meters, including 37408 square meters above ground and 20900 square meters underground. The total investment of the project is about 50.11251 million yuan.
The height of the first floor above ground is 5.2 meters, and the height of the second to fifth floors is 4 meters. The above ground part is arranged with teaching area, office area, accommodation area, and cafeteria area. The height of the first underground floor is 6 meters, and the underground part is equipped with basketball courts, equipment rooms, auxiliary rooms, motor vehicle parking, and non motor vehicle parking.
As a qualified supplier, CHINA ZBB Group has provided stable, reliable, efficient and energy-saving SCB14-1600/10 (2 units) dry-type transformers for this project to ensure that the school can obtain reliable power support in all situations.